Valero McKee Refinery Starts FCCU After Maintenance
DAVENPORT, FL (DTN) — Valero Energy is scheduled to begin startup Tuesday (10/6) of the fluid catalytic cracking unit at its 200,000 bpd McKee refinery in Sunray, Texas, following maintenance in Complex 1, according to a filing with the Texas Commission on Environmental Quality (TCEQ).
The startup is scheduled to begin at noon CT Tuesday and continue through noon Sunday (10/11), a five-day period.
Valero expects opacity at the FCCU stack vent could reach 100% during the startup, compared with a permitted limit of 20%, according to the filing.
Refinery personnel will follow established procedures to minimize the amount and duration of emissions associated with the startup.
The FCCU is a key gasoline-producing unit that converts heavier refinery streams into gasoline blendstocks and other lighter products. The filing did not indicate the extent of any production impact associated with the maintenance or startup.
The McKee refinery primarily produces gasoline, diesel and jet fuel.
DTN reached out to Valero Energy for additional details but did not get an immediate response.
(c) Copyright 2026 DTN, LLC. All rights reserved.